Bathroom Rebuild

Peter

Peter had seen our other bathrooms that were completed for friends of his and he asked us to quote for the updating of an en-suite in his home.

We removed the old suite and tiles which meant that we had to re-board the bathroom with new moisture resistant plasterboard. We made sure that the walls were plumb and square to allow correct alignment of bath and shower screen. We added a false wall to allow the medicine cabinet to be sunk into the wall. We added a shelf within the shower and laid all the piping necessary for the hidden shower controls and shower head. We moved the soil pipe a to allow the new wall-hung toilet to be installed. We reconfigured the plumbing to allow a new position for the wall hung basin, new radiator and new dual fuel towel warmer.

List of tasks

  • Remove and dispose all walls and suite
  • Rebuild walls making plumb and square
  • Install wall hung suite, sunken cabinet
  • New dual fuel radiator and CH radiator
  • Fully Tile walls
  • Prepare floor for tiles
  • Tile floor