Brown Rot eradication, Bathroom and structural repairs

IMAG1848
Completed Bathroom

Jill

We met with Jill before the property was purchased. We looked through the vendor’s surveyor report and noted some omissions. We provided an estimate to rectify the problems that we could see without disturbing the fabric of the building. Our estimate allowed Jill to enter into negotiations with the vendor from a position of strength. The bedroom to Bathroom conversion was completed as part of a full house refurbishment

The previous owners had made a structural alteration that was dangerous (see other page here). We needed to support the opening below the bathroom correctly so we took the opportunity to drop the bathroom floor to give more headroom. The bathroom was a single brick extension, we rendered to add some stability to the walls and fully insulated the room. We installed the suite, shower and a small airing cupboard that also housed the new CH Boiler.

List of tasks

  • Eradication of dry rot outbreak
  • Structural Support of floor
  • Rebuilt floor with new joists
  • Fully Tiled
  • Installation of bathroom
  • New airing cupboard
  • Fully insulated
  • New window