Bathroom Rebuild

Christine

This bathroom renovation was part of a full house refurbishment that had more than a few buried surprises for us all.

When we removed the old suite we could smell the tell-tale signs of rot. We made a hole in the floor and inserted a camera to record what was out of sight. We uncovered a bad rot infection. We removed all diseased timbers, treated the area correctly and rebuilt the floor. The poor insulation, responsible for mould growth on the ceiling due to condensation, was removed and PIR insulation added prior to overskimming all surfaces. We installed a wall mounted bath tap and provided services for a wall mounted basin. We relocated the toilet to make room for a walk in shower that was clad with aqua-board.

List of tasks

  • Remove and dispose all wall coverings and suite
  • Rebuild walls making plumb and square
  • Eradicate Rot infection
  • Wall mounted basin, Wall mounted bath tap
  • New¬†towel radiator, Move toilet
  • Rebuild floor
  • Correctly insulate ceiling
  • Fully Tile walls
  • Prepare floor for tiles
  • Tile floor