Alteration to internal supporting wall, opening up kitchen space

The project required that we remove this wall, the cloakroom behind the hallway, and the next wall into the existing kitchen.

After adequately supporting the floor above, we installed a universal beam, the size determined by our structural engineer.

Once we had completed the kitchen and the client had painted, the resulting space allowed the kitchen to flow into the dining space