Knock through into Dining Room

Structural alteration

The project required that we remove the supporting wall between the kitchen and the room next to it.

structural Alteration

After adequately supporting the floors above we removed the wall. The building inspector did not want structural engineers calculations given the size of the aperture and what needed to be supported, he determined the universal beam size.

Once the wall was down, we replastered the walls and added a new ceiling and floor covering. Finally we installed a new kitchen